951-552-0709
Permits and approvals

Sign permit and landlord approval services in Southern California We handle the paperwork so your sign goes up.

Tov Sign handles sign permits and landlord approvals as part of our sign projects across Southern California. We prepare the drawings, check your city's sign code and your center's sign criteria, and submit everything for you. It starts like every project: a free 3D mockup on your building and an itemized quote within 24 hours.

Call 951-552-0709
  • Free 3D mockup in 24 hours
  • Permits & landlord approval handled
  • Installed by our own crew
Building sign on a commercial office building Sign Permits · Southern California
Options

Types of sign permits we build

Not sure which fits your building? Send a photo and we'll recommend the right option in your free mockup.

City sign permits example 01.

City sign permits

Applications to the city's building or planning department showing the sign's size, location and construction.

Landlord and property manager approval example 02.

Landlord and property manager approval

Approval packages with drawings, a mockup and specs, prepared to match your lease and the center's sign criteria.

Sign criteria review example 03.

Sign criteria review

Checking your shopping center's sign criteria or master sign program for letter height, colors, lighting and mounting rules.

Electrical and structural details example 04.

Electrical and structural details

Electrical details for lit signs, and footing or attachment details for monuments and heavier wall signs when the city requires them.

Permit drawings example 05.

Permit drawings

Scaled elevations, site plans and sign details that show exactly what will be built and where.

Our work

Sign Permits we've installed

See all our work
Shopping center sign approval for a retail tenant in Corona, CAExample photo
Shopping center sign approvalRetail tenant · Corona, CA

Do you need a permit for a business sign in Southern California?

In most cases, yes. Nearly every city in Riverside, San Bernardino, Orange and Los Angeles counties requires a permit for permanent exterior signs, including channel letters, monument signs and wall cabinets. Lit signs usually need electrical review as well.

Each city writes its own sign code. The rules commonly cover:

  • Sign area, often based on the width of your storefront.
  • Height and placement, such as how high a wall sign can go or how far a monument must sit from the street.
  • Number of signs allowed per business or per building face.
  • Illumination, including brightness limits in some areas.
  • Window signs, which some cities count toward your total sign allowance.

A sign put up without a permit can lead to fines or an order to take it down, and it can cause trouble with your landlord. We check the code for your address before design starts, so the sign in your mockup is a sign the city can approve.

Shopping center sign criteria and landlord approval

If you lease your space, the city is only half of the approval. Most shopping centers and commercial properties have sign criteria, a document that sets the rules for every tenant sign. It is often attached to your lease as an exhibit.

Sign criteria commonly specify:

  • Maximum letter height and sign length.
  • Allowed colors, and whether corporate brand colors are permitted.
  • Lighting type, such as front-lit, halo-lit or non-lit.
  • Mounting method, often raceway or flush mount.
  • Installation requirements, such as insurance and work hours.

Most landlords want to approve your sign before it goes to the city. We prepare a landlord approval package with scaled drawings, a mockup on the building, materials and electrical details. If the property manager asks for changes, we revise and resubmit. Once the landlord signs off, we move on to the city permit, so there are no surprises later.

How we prepare sign permit drawings and city submittals

A sign permit application is only as good as the drawings behind it. Incomplete drawings are one of the most common reasons for plan check corrections and delays. Our permit packages typically include:

  • Site plan showing the building, property lines and the sign location.
  • Building elevation with the sign drawn to scale and the storefront width noted for the sign area calculation.
  • Sign details covering dimensions, materials, colors and construction.
  • Electrical details for lit signs, including UL-listed components and how the sign connects to power.
  • Structural details for monument footings or heavy wall attachments when the city asks for them.

We submit to the city, respond to plan check comments and keep you updated. Review times differ from city to city, so we give you a realistic expectation based on where your business is. When the permit is issued, we fabricate the sign, and our crew installs it and is ready for any final inspection. Call 951-552-0709 to get started.

Why Tov Sign

What you get with every project

Fewer plan check corrections

Drawings are prepared to code and to your sign criteria from the start, which cuts down on back-and-forth with the city.

One company handles it

The team that designs and builds your sign also deals with the city and the landlord.

Clear answers up front

We tell you what your city and center allow before you settle on a design that would not pass.

Approvals before fabrication

We build your sign after approvals come back, so you never pay to rework a finished sign.

Specs

Materials & specifications

What we prepare
Scaled sign drawings, building elevations, site plans and sign details
Code review
City limits on sign area, height, placement, number of signs and illumination
Sign criteria
Shopping center or master sign program rules for size, color, font, lighting and mounting
Electrical
Lit sign details showing UL-listed components and the circuit connection
Structural
Footing and attachment details for monuments and heavier wall signs when required
Service area
Cities across Riverside, San Bernardino, Orange and Los Angeles counties

What affects the cost

  • City permit fees and review requirements, which vary from city to city
  • Number of signs and sign types on the application
  • Whether structural engineering or electrical details are required
  • Planning or design review, or a variance, for signs outside standard limits
  • Rounds of landlord review and revisions requested by the property manager

Every quote is itemized, so you can see exactly where the money goes before you commit.

How it works

A simple process that ends with your lights on.

Request

01.
About 60 seconds

Answer a few quick questions and upload your logo and a photo of your building.

Mockup

02.
Within 24 hours

We send a 3D mockup of your sign on your building, plus an itemized quote.

Permit

03.
We handle it

Approve the proof. We take care of city permits and landlord approval while fabrication is scheduled.

Install

04.
Lights on

Our crew installs, wires and tests your sign, then cleans up after.

Sign Permits FAQ

Sign Permits questions, answered

Still have a question? Call or text 951-552-0709.

Permit fees are set by each city and vary with the sign type, size and which reviews are required. Engineering, electrical details and design review can add to the total. We list permit-related costs as separate lines in your quote so you can see them clearly.

It depends on the city, the sign type and whether landlord approval or design review is needed. Some approvals move quickly and others take longer, especially when plan check asks for corrections. We give you a realistic estimate once we know your address and the sign.

Most landlords approve signs that follow their sign criteria. We design to those rules from the start and prepare a complete approval package. If the property manager asks for changes, we handle the revisions.

We find that out before you pay for fabrication. Usually the fix is a change in size, placement or lighting. Some cities offer a design review or variance process for signs outside standard limits, and we can explain what that involves for your location.

We don't recommend it. Unpermitted signs can lead to fines, removal orders and problems with your landlord. Getting the permit up front protects the money you put into the sign.

Rules vary by city. Some cities require a short-term permit for banners, and some count permanent window graphics toward your total sign area. We check your city's rules as part of the project.

Your business address, a few photos of the building and your logo if you have one. If you lease, send your sign criteria or your property manager's contact. If you don't have a logo file, we can rebuild it from a photo or sketch.

Approve before we build

You sign off on the final proof before anything goes into production.

Built right or we remake it

If your sign doesn't match the approved proof, we fix it at our cost.

Permits handled

City submittals and landlord packages are part of the job, not your homework.

Call